
Kitchen services
Everything in a kitchen remodel
Nine parts of the job. Price the ones in yours and see them in 3D.
Cabinet replacementNew cabinet boxes, doors and drawers. Usually the biggest line.See cabinet replacement
Cabinet refacingNew doors and fronts on cabinet boxes you keep.
CountertopsQuartz, granite or wood, cut to fit once cabinets are set.
Kitchen islandsExtra prep space, storage and a spot to sit.
Open layoutsOpening the kitchen to the dining or family room.
Backsplash and tileTile or a stone slab behind the counters.
Kitchen flooringTile, wood or luxury vinyl built for a kitchen.
Lighting and electricalRecessed lights, pendants and the circuits code requires.
Sinks and plumbingA new sink and faucet, in the same spot or a new one.How it works
Four steps, at your pace
- 01
About a minute
Price it
Answer a few questions about your kitchen: how big it is, and whether cabinets, counters, an island, appliances, floors or lighting are part of the job. Enter your ZIP and you get three finish levels, each broken out line by line from Cincinnati trade wages.
- 02
A few minutes
See it in 3D
Choose the layout that matches your kitchen, from a single wall to a U with an island. Then pick doors, colors, hardware, counters, backsplash and flooring, and walk around the room. The price changes with every pick.
- 03
On your schedule
Have it checked
When you want to move forward, a licensed local contractor comes out, measures, looks behind the walls and confirms your number.
- 04
Usually 4 to 8 weeks on site
Build it
The contractor pulls permits and orders cabinets, which usually take 3 to 8 weeks to arrive. Once work starts, a kitchen that keeps its layout usually takes 4 to 8 weeks.
Price your whole kitchen
Pick what is part of the job. The price follows every choice.